The pack is always live. Contactors are the only thing between it and the rest of the car. A conversion needs one on the positive side and one on the negative side, so that opening them isolates the pack on both poles, not just one.

Why two contactors

  • Both poles isolated. With only a positive contactor, the negative rail stays bonded to every HV component. One insulation fault on the positive side somewhere downstream and the whole bus is energised against chassis again.
  • One welded contact is survivable. If main + welds, main − can still open the loop. The controller should notice the weld and refuse to start again.
  • The order matters. Main − closes first, with no current, because the loop is still open. The positive side does the switching: precharge relay first, main + last.

Why precharge

The inverter has a large DC-link capacitor across its input. At 0 V that capacitor looks like a short circuit. Close main + onto it directly and the inrush is limited only by cable, contact and capacitor ESR resistance: thousands of amps for a few milliseconds. That is enough to weld contacts on the first close.

Precharge puts a resistor in series for the first part of the charge. The capacitor charges along an RC curve. When the measured link voltage is close to pack voltage, main + closes across a small remaining step, and the precharge relay opens.

Precharge: main contactors, precharge relay, and the RC curve

This figure is interactive and needs JavaScript. The text description below covers the same content.

Step through the close sequence, then change pack voltage, resistor, capacitance and threshold. Switch to the blind timer to see how a fixed delay welds a contactor when the capacitor gets bigger.
Text description

Schematic: the pack positive runs through the main fuse F1 to the main positive contactor K1. A precharge relay K3 in series with a resistor is wired in parallel with K1. The pack negative runs through the main negative contactor K2. Both rails end at the inverter DC-link capacitor.

Sequence: all open; K2 closes (no current, no loop yet); K3 closes and the capacitor charges through the resistor; when link voltage reaches the threshold (commonly 90% of pack), K1 closes; K3 opens.

The plot shows link voltage rising as V(1 − e^(−t/RC)) while precharge current decays from V/R. The readouts give the time constant, time to threshold, peak current and power in the resistor, the energy the resistor absorbs, and the voltage step K1 sees when it closes.

What the controller should check

  • Close on voltage, not on a timer. Measure link voltage (inverter-reported or a dedicated sense) and close main + only above the threshold. Contactor capacitive-make ratings assume roughly 80% minimum, 90% nominal precharge.
  • Precharge timeout is a fault. If the link does not reach threshold in a few time constants, something is wrong: a shorted bus, a failed resistor, or a load that is already drawing current. Open everything and stop.
  • Weld check before close. With all contactors commanded open, link voltage should be near zero. Voltage there means a contact is stuck.
  • Resistor sizing is pulse energy. The resistor absorbs roughly ½CV² per precharge (shown in the readout). Its continuous rating can be small; its pulse rating cannot.
  • Economisers. Many main contactors pull in at full coil current and then drop to a lower hold current. Some have the economiser built in; others need an external one. Check the coil part number.

Resistor and threshold values in the figure are illustrative. Use the inverter and contactor datasheets for your build; the contactors and precharge note lists what the common contactor sheets actually say.